Consent Documents
Required Specifications
Required Supporting Documents
Easypell V1 Flue Design and Installation
Download
Easypell V2 Flue Design and Installation
Download
PS1 Seismic
Download
>> Additional supporting documents you will need to supply to the council:
An authorisation to submit on behalf of the property owner
A specific engineer’s design PS1 and supporting calculations for seismic restraint. For concrete less than 60mm
Certificate of Title that is less than 3mths old.
Order one: https://lrs.linz.govt.nz/search/Site safety plan
The installation is being undertaken on a private site. All work to be covered by installer’s health and safety plan in accordance with current WorkSafe requirements.